Converting Steam Heating Systems to Heat Pumps Also Saves Water

Caroline Town HallThe Town of Caroline building which houses its courtroom and history museum was the subject of a  recent Taitem research project investigating potential water savings from the conversion of steam heating systems to air source heat pumps.

Steam heating systems are still quite prevalent in New York State.  A study Taitem did in 2017 (PDF) found that over 30% of the heating systems in the state use steam.   In some types of buildings, like multifamily, over 50% of buildings were heated by steam.  Steam heating systems are very common in New York City and are still not unusual in our Ithaca area.  For example, the old Caroline Town Hall is heated by steam and is in the process of preparing to convert to heat pumps.

We have always known that steam heating systems lose water through leaks, air vents, and condensate tanks.  And so they consume water.  If we convert these heating systems to heat pumps, we will expect to not only save energy and reduce carbon emissions, but also reduce water use.  But how much water will be saved?

Another research project Taitem conducted in 2010, Steam Boiler Replacements (PDF), indirectly estimated water use as possibly being high.  However, in that 2010 research project, we did not directly measure water losses.  Instead, we estimated it based on total building water use.

The upcoming heating conversion (to heat pumps) of the old Caroline Town Hall presented a great opportunity to measure water use and so measure potential water savings.  We installed a water meter on the water pipe that goes right to the boiler in the fall of 2017.  In this way, we would be able to see exactly how much water is being consumed by the heating system, independent of other water uses in the building.  Mark Witmer, the Caroline Town supervisor, diligently read the water meter and gas meter over the last two winters, and the results are in.

Caroline Town Hall boiler 2019In the one-year period between January 2018 and January 2019, 4104 gallons of water were consumed.

Usage is clearly higher in winter.  This means that the water is being lost when the boiler is firing, as we would expect.   1.5 gallons of water was consumed per cubic foot of natural gas burned.

Imagine over 4000 gallons of water being evaporated, per year, just to heat a small building. Caroline’s town hall building is just under 4000 square feet, so the water being wasted is approximately one gallon of water per square foot per year.

The water cost savings in a typical building would not be financially significant, just a few dollars per year, because water rates are so low at present.  And at Caroline, the water comes from a well, so the savings will be even lower; just the electric cost savings for pump power.  And as a fraction of our total water use, the savings are also not high.  A typical person uses over 30,000 gallons of water per year, at home.

But still, the potential water savings are measurable and are another good reason to be planning to wean ourselves off fossil fuels.

Do you have a steam heating system?  We can tell a steam boiler from a hot water boiler in a few ways: by the pressure, type of radiator, and more.  Take a few photos of your boiler, the boiler nameplate, gauges on the boiler, and a couple of radiators, and send them to Ian at imshapiro@taitem.com.  He’ll be happy to tell you which you have.

Acknowledgment:  Thanks to Caroline Town Supervisor Mark Witmer for his interest, enthusiasm, and contributions to the project.

 

Taitem announces closure of solar installation division

Taitem Engineering is grateful to its clients for supporting the growth of solar energy. The Taitem team continues to believe wholeheartedly in the vital role of solar in achieving local, state, and global climate goals. Taitem is proud of the quality work it has done installing solar for homes and businesses across the region — with more than 300 solar PV installations over 6 years, totaling 3.6 MW of capacity.

After much deliberation and consideration of alternatives, Taitem has decided to close its solar installation division. Since 1989, Taitem’s core competency has been consulting engineering. This decision reflects a commitment to Taitem’s energy and sustainability consulting and design engineering services, which are in greater demand than ever before. Taitem will continue to provide solar engineering and commissioning and will maintain a solar service team for operations and maintenance.

Installation staff will be at work through February 2019 installing solar PV systems already under contract. Taitem’s 10-year workmanship warranty on solar PV arrays remains in place for all installed systems, and the company is retaining staff, led by Dave Tedeyan, for service needs. Manufacturer equipment warranties will remain unchanged.

The anticipated effective date of the closure is February 28, 2019. Taitem staff is implementing a careful transition plan to make sure that clients’ needs are met, employees are well supported and all administrative matters are addressed.

Several of Taitem’s solar employees will remain with the company working in our Energy+Sustainability and Quality Assurance departments. Dave Tedeyan, the solar service manager, will be available for technical support and to resolve any service or warranty issues with manufacturers such as SunPower.

For the many people and businesses who have referred friends to Taitem for solar in the past, the company extends its thanks. Referral fee payments for recent site visits and closed contracts will be mailed soon.

Taitem President Lou Vogel shared, “We are so proud of our awesome solar team and the award-winning quality work they have done over the years. Going forward, Taitem Engineering will maintain and expand its core consulting services in energy efficiency, sustainability and building design, and help to develop carbon reducing solutions grounded in building science. The company will keep up its active contributions to the Ithaca community and to clean energy and green building efforts locally, statewide, and beyond.”

Service Manager Dave Tedeyan and President Lou Vogel and are happy to discuss any questions and concerns with Taitem’s many clients, friends and solar advocates in the community.

Contact info
Lou Vogel lvogel@taitem.com, 607-277-1118 x125
Dave Tedeyan dtedeyan@taitem.com, 607-930-3481 x6 or 607-277-1118 x121

Rx for your Cx Pain

Starting in October 2016, New York State and New York City codes require commissioning (known as Cx) on new construction and substantial renovation projects. Commercial buildings with mechanical capacities larger than 480K Btu/hr cooling, or 600K Btu/hr heating and service hot water must comply.

Building professionals are finding out the hard way that developing the necessary commissioning specs takes time and planning in the early stages of a project. Recently Taitem has fielded several calls from project teams, already deep into construction, who have just learned that they needed a building system commissioning plan but had not allocated any time or budget. Taitem’s certified Cx professional Nate Goodell has been able to help, but including commissioning from the start would have saved these teams time, money and  unnecessary headaches.

Here’s a prescription so you won’t be caught painfully short on your next project:

  1. Understand which buildings and renovations require code commissioning (Quick Facts sheet)
  2. Develop appropriate commissioning specs. Include them in bid docs.
  3. Include the Cx plan and agent in project kickoffs.
  4. Factor into the construction timeline onsite Cx testing and issue resolution.
  5. Review both your preliminary and final Cx reports promptly and file them on time.

Download Taitem’s Cx white papers for detailed info on required testing and report deadlines in New York State and New York City.

Let us know if Taitem can answer questions or be of service.
Email Nate Goodell [ngoodell@taitem.com].

Test drive the Ithaca Green Building Policy

The Ithaca Green Building Policy (IGBP) is being codified and will be a standard building practice in 2019 in both the city and town of Ithaca.

When asked to design to a particular standard, it’s expected that building professionals will react with a bit of resistance and uncertainty. Building owners and developers likely have concerns about the potential time and cost associated with building to new standards. Architects and engineers will need to study the new building code and will also need to educate local clients about the different “paths” they can choose under the new policy.

To gain a better understanding of the policy, we decided to take a close look at a couple of projects we completed in the past two years and see how they would measure up under the IGBP. The exercise gave us the opportunity to review the standards, understand the differences in the residential and commercial point system, and document some questions that we reviewed with Ian Shapiro (Taitem founder and co-creator of the IGBP).

Here’s a list of what we used as a reference:

The Ithaca Green Building Policy Guide and Final Report. In particular, section 2.14 “Pulling it all together: Recommendations.”

Comcheck. We reviewed two commercial projects and found the majority of information we needed to complete the “Easy Path” right in this report. 

GoogleMaps.

Project drawings and history. These were brief recollections shared verbally by the project manager.

We also created a few building calculation templates that we bounced back and forth among team members at Taitem and STREAM Collaborative. It was an exercise that didn’t take much time and helped us answer some questions about compliance. Here’s what we found:

 

 

Go with the flow: Water efficiency requirements in NYS

In 2017, New York State (rather quietly) adopted the EPA’s high-efficiency “Water Sense” requirements for residential faucets, toilets, and shower heads. Note the water use numbers in this screenshot of section 2.39 from the NYS Building and Standards and Codes Supplement.

The gallons per flush (GPF) for toilets was previously 1.6 GPF and is now 1.3 GPF. Showers heads were previously limited to a maximum of 2.5 gallons per minute (GPM) and are now 2 GPM.

Many building professionals are not yet aware of these new standards. Continuous code development is essential and we can all take responsibility for sharing the news on improving standards.

Let’s spread the word. And for building professionals who want to improve efficiency even further, we might consider going with California’s flow requirements: 1.28 GPF for water closets, 1.8 GPM for showers and 1.2 GPM for faucets.

Taitem presenting at NYSERDA Multifamily Summit Oct 21-23 in Syracuse

Learn the latest on energy efficiency for the NY multifamily sector. This annual conference is the place to update your knowledge of new technologies, design approaches, energy codes and guidelines, and financing options. Taitem founder Ian Shapiro will speak on developments in standalone heat pump hot water heaters in apartment buildings. Betsy Jenkins Parrington, Senior Energy Engineer, and Tim Allen, Senior Energy Analyst, will share results of a pilot program that is testing a new way to meter fuel oil in multifamily buildings. Senior energy analyst Evan Hallas will present and lead a discussion on small packaged heat pumps. Network with the Taitem team and other industry thought leaders and doers.  Register Here.

Domestic Hot Water Distribution: Two Approaches

In multifamily buildings, domestic hot water can represent as much as 50% of the fossil fuel load and therefore must be addressed as we move towards higher and higher performing buildings. But upgrading domestic hot water equipment to more efficient technology can be challenging. Two DHW experts will explore different approaches. Karla Butterfield of Steven Winter Associates Inc. will discuss central distribution systems using case studies which demonstrate new requirements, solutions and measurement of performance.  Ian Shapiro of Taitem Engineering will discuss air source heat pump hot water heaters, including both energy benefits and factors to consider for implementation in a multifamily building.

In-line flow meter
In-line flow meter

Piloting Ultrasonic Technology
to Meter Fuel Oil
Ultrasonic tank level meters are promising to revolutionize the metering of oil in multifamily buildings.  Taitem’s Tim Allen and Betsy Parrington will describe a NYSERDA pilot program testing the accuracy and usefulness of these new meters.  The 5-year pilot is approximately half way to completion, and the presentation will include preliminary results, lessons learned so far, and a comparison of ultrasonic meters and in-line flow meters.

Small Packaged Heat Pumps

Heat pumps are a key strategy for eliminating fossil fuel use, but split system heat pumps are costly.  Multifamily per-room heat loss is becoming so small, whether through deep energy retrofits or high-performance new construction, that a small packaged heat pump might really be JUST what’s needed for widespread adoption. Evan Hallas will lead this lively discussion based on Taitem’s recent study of existing and emerging technology that’s shrinking heat pump size and cost to fit growing market demand.

Learn skills, gain expertise and make connections at this NYSERDA event

  • Hear about new and innovative net-zero and passive house design strategies
  • Acquire deeper understanding about changes in the energy code and federal guidelines for new construction
  • Expand knowledge on integrating renewable technologies in multifamily building upgrades
  • Meet energy financial and planning experts
  • Learn about new technologies for multifamily contractors

To register: https://www.nyserda.ny.gov/ny/2018-Multifamily-Summit

Simple tips for effective communication

In the building industry, projects depend on many different minds working together toward a common goal. There are technical experts, designers, government planners and inspectors, and interested members of the public, to name a few. Learning how to provide technical information, project timelines, financial guidance and so much more to all parties involved, takes practice, patience, and a lot of smart communication.

A good project leader can figure out the strongest forms and timing of communication for the team they are managing, while communicating equally effectively with the client and owner. Communication about design details among the architects and engineers on a project may look different than communication to the end client. For example, your team knows that COs slow things down in the construction phase, but your end client might not know that “CO” stands for “change order.”

The tone and sense of professionalism you wish to convey applies to all audiences; there are tools that support effective communication no matter who you need to share information with. Once you have a few proven techniques for delivering information, there are no “difficult clients” and there are fewer instances of lost time or money on a project. As design consultants, we strive not only for timely and efficient communication, but also for straightforward ways to share our expertise as we move through a project. An educated and empowered client will go on to advocate for architects and engineers — and their smart building practices.

Beth (far right) meets with Taitem partners

Taitem staff members are always working to improve the way they deliver engineering expertise and seeking new forms of communication among building industry professionals. I sat down with two of our top project managers to learn how they are communicating with their teams. Beth Mielbrecht is a Partner and Senior Engineer at Taitem, where she manages contracts for statewide energy programs and research. Her projects and the teams she manages typically grow and change over several years. Evan Hallas is a Senior Energy Analyst who manages the Aeroseal department and communicates daily with building owners, developers, contractors, and other building professionals.

Evan collecting Aeroseal data

These conversations have led to the insights I’ve shared below. I’ve also included some GENERAL TIPS that I’ve overheard while working alongside other outstanding engineers at Taitem. Check out what we’ve shared and please reach out with any of your own techniques for effective communication.

Know your audience


Evan says that a key component for communication is knowing who on the team already understands the value of his work and the technology he is presenting — and who needs more information. You don’t need to spend time convincing the person who already supports your work; you need to give them the tools they need to convince their team. Know your role in the decision-making process. If you are the technical expert, show up and give them the technical expertise they need with confidence. Each project has a decision-making team, and some have one final decision maker. Support the team by understanding whom each person reports to, and ask yourself, “What does each team member need to understand the information? Data sheets? Visuals of the final product in place? Financial documents?”

GENERAL TIP: Ask your client if they have any upcoming meetings where they will be delivering information that includes your services or potential project support.  Offer to format your materials in a way that they (your contact) thinks their team will understand. They may not think you can help with that aspect of delivering your value and they will appreciate you taking that extra step.

You need more than one form of communication

Beth uses a blend of email and phone communication to deliver messages to her team. Some people prefer one over the other. The best way to determine what works? Ask! Decide on the best form of communication at the project kickoff meeting. If your client says they appreciate phone calls, find time for the occasional call to check in or deliver news.

Beth notes, “If I have a meeting over the phone, I’ll send an email as a follow-up to the phone call. I have a general format in my mind that I use to provide an overview of what was discussed. I’ll summarize our talk, offer some bulleted action items, and close with a reminder of our next meeting. This is great for documentation. I also send regular project updates via email no matter what communication platform is preferred. This keeps the team up to date.”

GENERAL TIP: Put the project name and phase in the subject line and apply it to all email communication for the project. This will make finding the right email thread quick and easy.

Communicate frequently

Evan likes to over-communicate with brief updates throughout the project. He shared, “I call all the time. Good and bad news. I over-communicate so that if something does go bad, the clients knows that you have control over the project. Delivering good news builds confidence. They understand that things happen and situations arise in buildings that you don’t necessarily have control over. If they hear from you all the time, they know you’re not being negligent. It might be a voicemail that doesn’t need a response — just an FYI — and I’ll let them know they don’t need to take the time for a call back.”

GENERAL TIP: Tell your client how much you will communicate so they are aware of your routine. You might have 20 projects going on, but for them, this is the only one they are working on right now. I bet they want to know how it’s going.

Lists are important


You might already be using a shared list that for managing communication among teams during the design and construction phase of a project. Identifying the need for additional lists among trades in different phases of a project could help with project efficiency and provide the end client with a strong sense of what you need to keep things moving forward.

When the building design components start to get laid out at meetings, there are always questions that come up from supporting trades as well as the end client. Questions to help clarify the design come up when you’re outside of meetings too.  In an effort to keep things organized, it makes sense to list questions in a shared place. You could create a list of all of the questions that arise (stored in a cloud such as GoogleDocs that supports live editing by several people) with columns that clearly identify when and whether the question is answered, what the answer is, and who best person to answer the question is. When the question is resolved, you change the color of the row (I vote for light purple, but gray is easy on the eyes). The most important part of creating this type of list is sharing it with the entire team, including the end client, and including a simple email message that explains how you will work within the document.  

GENERAL TIP: Email the team (or only those who have questions that need attention) at a set time each week. For example, on Monday, the team gets the list and is asked to review questions that need answering.  

To meet or not to meet

Beth shared, “Periodic project meetings are very common. I prefer to have meetings when there is set agenda of items that need to be discussed. This makes the meeting more important and much more productive. When I have an outlined agenda, I also don’t get nearly as many cancellations.”

She continued, “Because I am the key liaison for my projects, I personally communicate with the entire project team. All members of the project team report to me, and all of their reports and updates come to my inbox. When an issue arises, after careful evaluation, I invite the people on the team who are involved in the problem to the meeting to work on the resolution. Depending on the size and scope of the issue, I inform key stakeholders of the communication, resolution and milestones once they are achieved.”

GENERAL TIP: Before you use the CC fields, ask yourself, “Does this person really need to be part of this communication?”

Clear and concise with a dash of feeling

Beth believes that using bulleted lists and simple spacing between paragraphs, can go a long way. Technology threatens to overwhelm us with information, which makes it hard to find and process the information we need. There is so much information written in so many different ways, and standards for clear writing are often overlooked. Beth shared, “Through years of managing different teams and various projects, I have learned how concise and clear communication builds trust and confidence in everyone. This informs my work now. My emails need to be simple and clear. My goal is usually to state action items and deliver the message effectively without additional noise.”

GENERAL TIP: Always include a deadline. Whatever the action items include, even if a definitive deadline does not exist, provide a date.

Leverage your firm’s brand

Your firm has its own mission and key values that help to develop its brand. Use that to your advantage when you are developing your communication plan at the project onset. Allow that to inform how you’re talking to the team, and keep it in mind when you’re crafting emails and presenting options. If your firm focuses on dependability and sustainability, for example, then use words that reflect this position and apply those words in your emails.

Evan shared, “I communicate Taitem’s responsibility. I make sure the client understands that Taitem is a responsible firm…that we are expert engineers with years of experience. I let them know that they don’t have much to worry about because I have the weight of Taitem behind me and that even though the client may not know me personally, I stand for Taitem as a whole. We will make things correct and work alongside the client to deliver expert service. I’m super confident when I communicate that. It goes a long way.”

GENERAL TIP: Don’t be afraid to use and repeat the words directly from your mission statement and website.

Debrief to review successes and shortcomings

This seems like a no-brainer, but it’s tough to take the time to do this after a project is complete.   Establish a process for closing out a project that includes an internal debrief with your team. This debrief is the opportunity to revisit successes and where identify tasks and people might need support moving forward. This builds morale, makes it easy to share ideas, and improves the design process. If you’re comfortable getting feedback directly from the end client, have that ready to share internally when your team comes together. Celebrate your successes as a team and acknowledge where you can improve.

GENERAL TIP: Don’t delay. Get some feedback from the client as soon as the project is complete. Then meet internally before a month goes past. It’s important to share best practices and potential for improvement when the project is fresh.  

 

Taitem recognized internationally as B-Corp “Best for the World”

Today, Taitem Engineering was recognized among B-Corporations worldwide as a 2018 Best for the World honoree for the environment.


What does this mean?

It means that Taitem is creating the most positive environmental impact based on an independent, comprehensive assessment of 2,400 other certified B-Corporations administered by the nonprofit B Lab. B-Corps around the world were evaluated based on the environmental performance of their facilities, materials management, GHG emissions, and resource and energy use. Honorees like Taitem scored in the top 10% and set a gold standard for businesses that are a force for good around the world.


Taitem Engineering made the list thanks to its mission-driven business model, embodied in its name, “Technology As If The Earth Mattered.” We stand proudly among other B-Corps which were honored, including Patagonia, Etsy, Seventh Generation, King Arthur Flour, and Ben and Jerry’s.


Thanks to support from our clients, the strength of our community, and the service of our dedicated staff, we are walking our company talk to benefit the planet and its people. Taitem is an Ithaca-based firm, rooted in their local community and is being recognized internationally as an environmental steward. Check out the official press release here.

Look for videos with some fun info on our Facebook and LinkedIn pages today and throughout the week. Here are the direct links to the videos in the series if you want to take a sneak peak.

Thank you to our community and clients

We’re going above and beyond

More than engineers

Standing proud among other B-Corps

Please share the news with your network. B-corporations help shape a positive future for our environment. You can learn more about what it takes to become a B-Corporation at www.bthechange.com

Ithaka Terraces Condos Offer Fossil-fuel-free Living

While the hillside location of Ithaka Terraces was a challenging spot for construction, developer Ed Cope and architect Noah Demarest make creating an all-electric Net Zero Energy condominium complex look surprisingly do-able. Prospective homebuyers, and energy geeks, have a chance to tour and learn more during Open House events on May 12 and 13. Read our interview with developer Ed Cope below.

The twelve new homes at 215 Spencer Rd, just 3 blocks from the Ithaca Commons, are inspired by the traditional architecture of the Greek island of Ithaka half a world away. They also demonstrate what best practices in green building make possible. The building designs are so energy efficient that an off-site solar farm will generate all the electricity needed to heat, cool, illuminate and power appliances in all the homes.

Ithaka Terraces exterior with all-LED lighting
Ithaka Terraces exterior with all-LED lighting
Ithaka Terraces interior with solar-powered heat pump
Ithaka Terraces interior with solar-powered heat pump

In the last two weeks, both the City and the Town of Ithaca accepted a new Green Building Policy report, creating a framework to promote sustainable development. While that is a vision that extends to 2030, Ithaka Terraces embodies many of the attributes today that the Green Building Policy seeks to encourage. STREAM Collaborative and Taitem Engineering authored that policy report, and the two firms had the opportunity to walk their talk on the design team for Ithaka Terraces.
We recently sat down with the developer Ed Cope to learn more about his vision:

When you started thinking about this project, what were the goals you had in mind?

EC: All my life I’ve been an environmentalist, particularly committed to energy efficiency and alternative energy. I live off the grid and installed solar panels back in 1984. I volunteered on the County’s Environmental Management Council. And I got into real estate, owning and renting properties through PPM Homes, an Ithaca property management company. Ithaka Terraces was a chance to build homes for people who want to enjoy an active urban lifestyle and do the right thing for the planet.

Why did you choose this spot for the Terraces?

EC: It’s a convenient location close to the Commons, parks, Ithaca College, Wegman’s and big box shopping areas along Elmira Rd. I agree with the City that urban infill is important as the City grows. This steep brushy hillside was part of the land the City had purchased to widen Spencer Rd. They tore down the rundown old apartment building, and the only new re-use that made sense was multifamily.

How did you prioritize the sustainability features for the overall design?

EC: My motivation is to provide the maximum possible state-of-the-art sustainable living with the highest emphasis on achieving net-zero energy while keeping the condo cost competitive with the market. Our solar farm 15 miles east made it an easy choice to go all-electric and avoid fossil fuels completely. Sustainable features include the use of air-source heat pumps, conduction ranges, LED lighting, electric water heaters, Low-E windows, super-insulated walls and roofs, smart temperature monitoring devices, and other energy-saving devices. We worked with NYSERDA’s New Construction Program, which provided some design guidelines to help achieve our goals.

For instance, the foundation is constructed of R23 Insulated Concrete Forms, providing continuous insulation on both the exterior and interior of the walls below grade and partially above grade. The slab is insulated with R15 rigid foam. The building features nominal 12-inch thick double stud exterior walls with a total of R39 continuous dense packed cellulous insulation and 18 inches of R63 loose fill cellulous insulation in the attic.

As led by Javier Rosa, PE, Taitem’s structural engineering design process supported maximum energy efficiency, by continually evaluating impact on the building’s energy performance. Two examples are:
• Wood wall studs were spaced farther apart than usual, to accommodate more cavity insulation
• Window and door headers were designed with 2 plies of wood members to ensure enough insulation to avoid thermal bridging (often headers are left completely uninsulated, causing a significant amount of heat loss.

What do you think your condo owners will like most about the Terraces?

EC: These homes support an active and climate conscious lifestyle so people can live their values every day. They support trends of the future that say we will be driving less, own fewer cars (and those will be electric) and be actively connected to the walkable urban community. Homebuyers will appreciate that they can get some clean energy options at half price – for example, I’m splitting the cost of optional Electric Vehicle charging stations and upgrades to induction stove tops.

What’s your favorite walk from Ithaka Terraces?

EC: The first is heading over to the west end of the Commons, the gateway to downtown. I walk that all the time. The second is up the hill to Turner and Hillview Place. It’s like a little Europe, with buildings up the hillside leading to two lovely, tucked-away pocket parks.

It’s clear that PPM Homes and the design team behind Ithaka Terraces are committed to empowering homeowners to live sustainably, and to enjoy all that downtown living has to offer. Ten of the twelve condos are still available, and visitors can tour them during the Open House on May 12 and 13.

Ithaka Terraces SQUARE

Encouraging Green Multifamily Housing Development by ASKING THE RIGHT QUESTIONS A Workshop for City and Town Officials

Ecovillage TREE by Bob Nape

Green building is an accelerating trend, spurred by new codes and requirements from New York State and Tompkins County. Both the Town and City of Ithaca are also developing new green building policies. There is a lot to learn, and municipal officials need to keep pace with developers, architects and contractors who are planning and permitting new multifamily housing projects. This workshop will help municipal staff and board members get up to speed with an overview of current green building technologies, terminology and codes.

Participants will learn the right questions to ask when reviewing proposed new housing developments. The format combines lecture with a green building features tour of the TREE neighborhood and a hands-on case study. The Town of Ithaca and the City of Ithaca will offer annual training credit for Planning Board members. Certificates of Completion will be presented to all attendees. Learn@Ecovillage is hosting the free workshops, in partnership with Taitem Engineering and the Tompkins County Planning Department. Funded by the Park Foundation.

Choose your date: April 30, May 11 or May 17.
Learn more and register.
Location: EcoVillage at Ithaca